Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Castle Green Hotel

Castle Green Lane, Kendal, LA9 6RG

Castle Green Hotel is an EV charging site in Kendal, Cumbria. It has a single 7 kW Type 2 socket, and the price is listed as 0.00. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Murley Moss Business Park (Fuuse), 1.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 2 May 2021Last verified 2 May 2021

Connectors

Type 2 · 7 kW1 connector

Site information

Opening hours
Not published
Access
Public
Price
0.00(from Open Charge Map, 2 May 2021)
Getting there
Situated to the right of the disabled parking bays, beneath the balcony/terrace.

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Castle Green Hotel?

The listed price is 0.00. Prices can change, so check the price at the charger before you start.

How fast is charging at Castle Green Hotel?

Up to 7 kW AC via Type 2.

How many charging sockets does Castle Green Hotel have?

1 charging socket: 1 × 7 kW Type 2.

Where is the nearest charger with 50 kW or more to Castle Green Hotel?

Murley Moss Business Park (Fuuse) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Castle Green Hotel?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Castle Green Hotel?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Castle Green Hotel?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 2 May 2021

Amp Map does not take payment. You pay the operator.