Fuuse · EV charging site
Murley Moss Business Park
Oxenholme Road, Kendal, LA9 7RL
Murley Moss Business Park is an EV charging site in Kendal, Cumbria, run by Fuuse. All 4 of its sockets are 50 kW CCS, and the price is listed as 50p/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Booths Kendal Instavolt (InstaVolt Ltd), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- 50p/kWh(from Open Charge Map, 29 Jul 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Murley Moss Business Park (Fuuse)?
The listed price is 50p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Murley Moss Business Park (Fuuse)?
Up to 50 kW DC via CCS.
How many charging sockets does Murley Moss Business Park (Fuuse) have?
4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CCS, 1 × 50 kW CCS, 1 × 50 kW CCS.
Who operates Murley Moss Business Park?
Murley Moss Business Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to Murley Moss Business Park (Fuuse)?
Booths Kendal Instavolt (InstaVolt Ltd) is 1.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Murley Moss Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Murley Moss Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Murley Moss Business Park (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.