Char.gy · EV charging site
1 Station Rise
1 Station Rise, Marlow, SL7 1EJ
1 Station Rise is an EV charging site in Marlow, Buckinghamshire, run by Char.gy. It has a single 5 kW Type 2 socket. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Court Garden Car Park (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 1 Station Rise (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 1 Station Rise (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 1 Station Rise (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 1 Station Rise?
1 Station Rise is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 1 Station Rise (Char.gy)?
Court Garden Car Park (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 1 Station Rise (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1 Station Rise (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 1 Station Rise (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Institute Road · 65p per kWh · 7 kW · 90 yd
- Fastest nearby
- Court Garden Car Park · 50 kW · 0.3 mi