Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Court Garden Car Park

Court Garden Car Park, Pound lane, Marlow, SL7 2AE

Court Garden Car Park is an EV charging site in Marlow, Buckinghamshire, run by BP Pulse. Its 3 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 0% uptime here over the last 30 days. 15 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hand & Flowers (Marlow) (evyve), 0.3 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or Type 2 · 50 kW1 connector · 89p per kWhOut of service
244150% reliabilityOut of order
Type 2 · 7 kW2 connectors · 65p per kWhOut of service
123860% reliabilityOut of order
123860% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
12386

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
Type 244 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 44 kW Type 2~56 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Court Garden Car Park (BP Pulse)?

The listed price is CCS £0.89/kWh · Type 2 £0.89/kWh · Type 2 £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Court Garden Car Park (BP Pulse)?

Up to 50 kW DC via CCS, Type 2.

How many charging sockets does Court Garden Car Park (BP Pulse) have?

3 charging sockets: 1 × 50 kW CCS, 1 × 44 kW Type 2, 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Court Garden Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Court Garden Car Park (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Court Garden Car Park?

Court Garden Car Park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Court Garden Car Park (BP Pulse)?

Hand & Flowers (Marlow) (evyve) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Court Garden Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Court Garden Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Court Garden Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.