Char.gy · EV charging site
3 Oxford Road
3 Oxford Road, Marlow, SL7 2NH
3 Oxford Road is an EV charging site in Marlow, Buckinghamshire, run by Char.gy. It has a single 4 kW Type 2 socket. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Court Garden Car Park (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 3 Oxford Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 3 Oxford Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 3 Oxford Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 3 Oxford Road?
3 Oxford Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 3 Oxford Road (Char.gy)?
Court Garden Car Park (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 3 Oxford Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 3 Oxford Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 3 Oxford Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- West street car park
- Court Garden Car Park
- Hand & Flowers (Marlow)
- Dean Street
- Marefield Road
- George and Dragon 2
- Cheapest nearby
- West street car park · 65p per kWh · 7 kW · 80 yd
- Fastest nearby
- Hand & Flowers (Marlow) · 75 kW · 0.2 mi