Char.gy · EV charging site
117 South Croxted Road
117 South Croxted Road, Upper Norwood, SE218AX
117 South Croxted Road is an EV charging site in Upper Norwood, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 61 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 232-236 Gipsy Rd, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 8 Mar 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 117 South Croxted Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 117 South Croxted Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 117 South Croxted Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 117 South Croxted Road?
117 South Croxted Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 117 South Croxted Road (Char.gy)?
232-236 Gipsy Rd is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 117 South Croxted Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 117 South Croxted Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 117 South Croxted Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.