Char.gy · EV charging site
169 Shakespeare Road
169 Shakespeare Road, Brixton, SE24 0PY
169 Shakespeare Road is an EV charging site in Brixton, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 191 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 1-25 Tulse Hill, Brixton (Monta), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- EV Charging Bay - PR Permit Holders
- Getting there
- PR Permit Holders only Mo-Fr 08:30-17:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 169 Shakespeare Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 169 Shakespeare Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 169 Shakespeare Road?
169 Shakespeare Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 169 Shakespeare Road (Char.gy)?
1-25 Tulse Hill, Brixton (Monta) is 0.5 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 169 Shakespeare Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 169 Shakespeare Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 169 Shakespeare Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 66 Lowden Road
- 74 Lowden Road
- 277 Shakespeare Road
- Shardcroft Avenue
- 18 Dorchester Drive
- 14 Dorchester Drive
- Fastest nearby
- 66 Lowden Road · 6 kW · 0.1 mi