Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Clenergy · EV charging site

74 Lowden Road

74 Lowden Road, Brixton, SE24 0BH

74 Lowden Road is an EV charging site in Brixton, Greater London, run by Clenergy. It has a single 6 kW Type 2 socket. 267 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 1-25 Tulse Hill, Brixton (Monta), 0.7 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 21 Apr 2025Last verified 21 Apr 2025

Connectors

Type 2 · 6 kW1 connector

Site information

Operator
Clenergy
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 6 kW Type 2~9h 13m
Tesla Model 3 Rear-Wheel Drive 10–80% · 6 kW Type 2~6h 39m
Audi Q4 e-tron 50 10–80% · 6 kW Type 2~8h 31m
Hyundai IONIQ 5 10–80% · 6 kW Type 2~8h 28m
MG Motor MG4 Trophy 10–80% · 6 kW Type 2~7h 7m
Hyundai Kona Electric Long Range 10–80% · 6 kW Type 2~6h 46m
Nissan LEAF 10–80% · 6 kW Type 2~4h 40m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 74 Lowden Road (Clenergy)?

Up to 6 kW AC via Type 2.

How many charging sockets does 74 Lowden Road (Clenergy) have?

1 charging socket: 1 × 6 kW Type 2.

Who operates 74 Lowden Road?

74 Lowden Road is on the Clenergy network.

Where is the nearest charger with 50 kW or more to 74 Lowden Road (Clenergy)?

1-25 Tulse Hill, Brixton (Monta) is 0.7 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 74 Lowden Road (Clenergy)?

A 10–80% charge takes about 9h 13m on the 6 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 74 Lowden Road (Clenergy)?

A 10–80% charge takes about 6h 39m on the 6 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 74 Lowden Road (Clenergy)?

A 10–80% charge takes about 8h 31m on the 6 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 21 Apr 2025

Amp Map does not take payment. You pay the operator.