Char.gy · EV charging site
180-182 Seaford Road
180 - 182 Seaford Road, Seven Sisters, N15 5DS
180-182 Seaford Road is an EV charging site in Seven Sisters, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 25 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - South Tottenham, 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 22 Jul 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- SA Permit Holders Only: Mon - Sat, 08:00 - 18:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 180-182 Seaford Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 180-182 Seaford Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 180-182 Seaford Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 180-182 Seaford Road?
180-182 Seaford Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 180-182 Seaford Road (Char.gy)?
Pod Point Tesco Superstore - South Tottenham is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 180-182 Seaford Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 180-182 Seaford Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 180-182 Seaford Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Lawrence Road · 7 kW · 0.3 mi