Total Energies · EV charging site
Lawrence Road
47 Lawrence Road, Seven Sisters, N15 4EF
Lawrence Road is an EV charging site in Seven Sisters, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 25 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - South Tottenham, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lawrence Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lawrence Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Lawrence Road (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2.
Who operates Lawrence Road?
Lawrence Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lawrence Road (Total Energies)?
Pod Point Tesco Superstore - South Tottenham is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lawrence Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lawrence Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lawrence Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Alton Road
- 180-182 Seaford Road
- 141-143 Seaford Road
- Suffield Road
- Pod Point Tesco Superstore - South Tottenham
- Willan Road
- Cheapest nearby
- Pod Point Tesco Superstore - South Tottenham · 44.4p per kWh · 50 kW · 0.4 mi
- Fastest nearby
- Pod Point Tesco Superstore - South Tottenham · 50 kW · 0.4 mi