Char.gy · EV charging site
33 Links Road
33 Links Road, Tooting, SW17 9EE
33 Links Road is an EV charging site in Tooting, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 261 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 21 High Street, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit GC Mon-Fri 8:30am - 6:30pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 33 Links Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 33 Links Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 33 Links Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 33 Links Road?
33 Links Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 33 Links Road (Char.gy)?
21 High Street is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 33 Links Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 33 Links Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 33 Links Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Cromer, Junction With Links Road
- ubitricity Distributed Energy Systems UK Ltd. Road Deal, Junction With Links Road
- ubitricity Distributed Energy Systems UK Ltd. 7 Ascot Road, Side Of 7 Links Road
- Ascot Road
- Sirdar Road
- ubitricity Distributed Energy Systems UK Ltd. 23C Grenfell Road, Outside 23C
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Cromer, Junction With Links Road · 67p per kWh · 5 kW · 30 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Cromer, Junction With Links Road · 5 kW · 30 yd