Char.gy · EV charging site
54 Shakleton Road
54 Shakleton Road, Coventry, CV5 6HU
54 Shakleton Road is an EV charging site in Coventry, run by Char.gy. It has a single 4 kW Type 2 socket. 110 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Croft Road (GeniePoint), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 54 Shakleton Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 54 Shakleton Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 54 Shakleton Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 54 Shakleton Road?
54 Shakleton Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 54 Shakleton Road (Char.gy)?
Croft Road (GeniePoint) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 54 Shakleton Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 54 Shakleton Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 54 Shakleton Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 193 Melbourne Road
- 97 Melbourne Road
- West Way Nissan Coventry
- 67 Hearsall Lane-B
- 80 Melbourne Road
- Opposite 20 Lord Street
- Fastest nearby
- 67 Hearsall Lane-B · 22 kW · 0.1 mi