Nissan UK Dealer Network · EV charging site
West Way Nissan Coventry
Spon End, Coventry, CV1 3HF
West Way Nissan Coventry is an EV charging site in Coventry, run by Nissan UK Dealer Network. It has a single 7 kW Type 2 socket. 112 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lower Holyhead Road (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · notice required
- Getting there
- Dealership forecourt. Access to Nissan owners only. Please report to reception during working hours. Fitted under Midlands PiP
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at West Way Nissan Coventry (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does West Way Nissan Coventry (Nissan UK Dealer Network) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates West Way Nissan Coventry?
West Way Nissan Coventry is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to West Way Nissan Coventry (Nissan UK Dealer Network)?
Lower Holyhead Road (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West Way Nissan Coventry (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Way Nissan Coventry (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West Way Nissan Coventry (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 193 Melbourne Road
- 54 Shakleton Road
- 97 Melbourne Road
- 67 Hearsall Lane-B
- Northumberland Road
- Pod Point Capital Group London
- Cheapest nearby
- Pod Point Capital Group London · 69.6p per kWh · 22 kW · 0.2 mi
- Fastest nearby
- 67 Hearsall Lane-B · 22 kW · 0.2 mi