Char.gy · EV charging site
86 Coventry Street
86 Coventry Street, CV2 4NF
86 Coventry Street is an EV charging site in Coventry, run by Char.gy. It has a single 3 kW Type 2 socket. 99 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 48-62 Clay Lane, Long Stay Car Park (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 86 Coventry Street (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 86 Coventry Street (Char.gy)?
Up to 3 kW AC via Type 2.
How many charging sockets does 86 Coventry Street (Char.gy) have?
1 charging socket: 1 × 3 kW Type 2.
Who operates 86 Coventry Street?
86 Coventry Street is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 86 Coventry Street (Char.gy)?
48-62 Clay Lane, Long Stay Car Park (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 86 Coventry Street (Char.gy)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 86 Coventry Street (Char.gy)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 86 Coventry Street (Char.gy)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Corner of Milton Road & Coventry Street
- Corner of Milton Street & Coventry Street
- Corner of Milton Street & Stratford Street
- 86 North Street
- Avon Street
- 2 Dennis Road-A
- Fastest nearby
- 2 Dennis Road-A · 22 kW · 0.2 mi