Char.gy · EV charging site
New Barns Road
New Barns Road, Mitcham, CR4 1LF
New Barns Road is an EV charging site in Mitcham, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 80 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London Road Croydon, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at New Barns Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at New Barns Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does New Barns Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates New Barns Road?
New Barns Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to New Barns Road (Char.gy)?
London Road Croydon is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Barns Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Barns Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Barns Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Castleton, Junction With Hadley Road
- Chestnut Grove
- 88a Chesunt Grove
- Holly Road
- 142 Sherwood Park Road
- Wide Way
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Castleton, Junction With Hadley Road · 67p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- Chestnut Grove · 7 kW · 0.1 mi