Total Energies · EV charging site
Chestnut Grove
161 Chestnut Grove, Norbury, CR4 1RB
Chestnut Grove is an EV charging site in Norbury, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 79 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London Road Croydon, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chestnut Grove (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Chestnut Grove (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Chestnut Grove (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Chestnut Grove?
Chestnut Grove is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Chestnut Grove (Total Energies)?
London Road Croydon is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chestnut Grove (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chestnut Grove (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chestnut Grove (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wide Way
- New Barns Road
- Holly Road
- 88a Chesunt Grove
- 39 Ivy Gardens
- ubitricity Distributed Energy Systems UK Ltd. Road Castleton, Junction With Hadley Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Castleton, Junction With Hadley Road · 67p per kWh · 5 kW · 0.2 mi