Char.gy · EV charging site
Thelbridge House
Thelbridge House, Bow, E3 3HL
Thelbridge House is an EV charging site in Bow, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 543 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Bow (InstaVolt Ltd), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- B2 Permit Holders Only, Mon - Fri, 08:30 - 18:30 or Pay by Phone
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Thelbridge House (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Thelbridge House (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Thelbridge House (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Thelbridge House?
Thelbridge House is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Thelbridge House (Char.gy)?
McDonald's Bow (InstaVolt Ltd) is 0.2 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Thelbridge House (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Thelbridge House (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Thelbridge House (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 6 Arrow Road
- ubitricity Distributed Energy Systems UK Ltd. 35 Arrow Road, Arrow Road
- ubitricity Distributed Energy Systems UK Ltd. Powis Road Opp Kingsley Hall, opp Kingsley Ha
- ubitricity Distributed Energy Systems UK Ltd. Powis Road, Northleigh House, Powis Road
- ubitricity Distributed Energy Systems UK Ltd. Bromley High Street, Henshall Point, Bromley
- ubitricity Distributed Energy Systems UK Ltd. Edgar Road, Junc. Bruce Road, Edgar Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 6 Arrow Road · 55p per kWh · 5 kW · 90 yd