Charge Your Car · EV charging site
A580 Park & Ride
Stranton Drive, Walkden, M28 2TH
A580 Park & Ride is an EV charging site in Walkden, City and Borough of Salford, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Novotel Manchester West Hotel (BP Pulse), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 2 May 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at A580 Park & Ride (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at A580 Park & Ride (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does A580 Park & Ride (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates A580 Park & Ride?
A580 Park & Ride is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to A580 Park & Ride (Charge Your Car)?
Novotel Manchester West Hotel (BP Pulse) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at A580 Park & Ride (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at A580 Park & Ride (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at A580 Park & Ride (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- A580 Wardley Park & Ride
- Ate CHARGER-01
- Worsley Park Marriott Hotel & Country Club
- Walkden Park & Ride
- Novotel Manchester West Hotel
- Limes Service Station
- Cheapest nearby
- A580 Wardley Park & Ride · 59p per kWh · 3 kW · 0.1 mi
- Fastest nearby
- Novotel Manchester West Hotel · 50 kW · 1.1 mi