Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ChargePoint · EV charging site

Ate CHARGER-01

10 Shield Dr, Swinton, M28 2QB

Ate CHARGER-01 is an EV charging site in Swinton, City and Borough of Salford, run by ChargePoint. It has a single 11 kW Type 2 socket. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wellington Road (Be.EV), 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2023Last verified 4 May 2023

Connectors

Type 2 · 11 kW1 connector

Site information

Operator
ChargePoint
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
1-408-841-4500

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 11 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 11 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 11 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 11 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 11 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 11 kW Type 2~5h 38m
Nissan LEAF 10–80% · 11 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Ate CHARGER-01 (ChargePoint)?

Up to 11 kW AC via Type 2.

How many charging sockets does Ate CHARGER-01 (ChargePoint) have?

1 charging socket: 1 × 11 kW Type 2.

Who operates Ate CHARGER-01?

Ate CHARGER-01 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

Where is the nearest charger with 50 kW or more to Ate CHARGER-01 (ChargePoint)?

Wellington Road (Be.EV) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ate CHARGER-01 (ChargePoint)?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ate CHARGER-01 (ChargePoint)?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ate CHARGER-01 (ChargePoint)?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 May 2023

Amp Map does not take payment. You pay the operator.