Charge Your Car · EV charging site
Boughton Street Car Park
Boughton Street Car Park, Sunderland, SR1 3ZZ
Boughton Street Car Park is an EV charging site in Sunderland (SR1 3ZZ), run by Charge Your Car. It has a single 7 kW Type 2 socket. Amp Map lists 1 other charge point named Boughton Street Car Park in Sunderland. 28 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Charles Street, Sunderland (Blink Charging), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Boughton Street Car Park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Boughton Street Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Boughton Street Car Park (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Boughton Street Car Park?
Boughton Street Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Boughton Street Car Park (Charge Your Car)?
Charles Street, Sunderland (Blink Charging) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Boughton Street Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Boughton Street Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Boughton Street Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.