Charge Your Car · EV charging site
Park Lane, Near Bus Station
Park Lane Shopping Village, Sunderland, SR1 3PE
Park Lane, Near Bus Station is an EV charging site in Sunderland, run by Charge Your Car. It has a single socket, with Type 2 at up to 7 kW, and charging is listed as free. 24 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Charles Street, Sunderland (Blink Charging), 0.4 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 28 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Park Lane, Near Bus Station (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Park Lane, Near Bus Station (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Park Lane, Near Bus Station (Charge Your Car) have?
1 charging socket: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Park Lane, Near Bus Station?
Park Lane, Near Bus Station is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Park Lane, Near Bus Station (Charge Your Car)?
Charles Street, Sunderland (Blink Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park Lane, Near Bus Station (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Lane, Near Bus Station (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Lane, Near Bus Station (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.