Charge Your Car · EV charging site
Crosskeys Lane
Crosskeys Lane, Felling, NE9 6DA
Crosskeys Lane is an EV charging site in Felling, Gateshead, run by Charge Your Car. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Team Valley Retail World, Gateshead (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 25 Oct 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Crosskeys Lane (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Crosskeys Lane (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Crosskeys Lane (Charge Your Car) have?
2 charging sockets: 2 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Crosskeys Lane?
Crosskeys Lane is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Crosskeys Lane (Charge Your Car)?
Team Valley Retail World, Gateshead (Osprey Charging) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Crosskeys Lane (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Crosskeys Lane (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Crosskeys Lane (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Saltwell Park
- Gateshead College Autoskills Centre
- Gateshead Housing Keelman House
- UK Land Estates
- Queen Elizabeth Hospital, Gateshead
- Team Valley Retail World, Gateshead
- Cheapest nearby
- Team Valley Retail World, Gateshead · 89p per kWh · 50 kW · 1.1 mi
- Fastest nearby
- Team Valley Retail World, Gateshead · 50 kW · 1.1 mi