Charge Your Car · EV charging site
Saltwell Park
off Joicey Road, Gateshead, NE9 5AX
Saltwell Park is an EV charging site in Gateshead, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Lobley Hill (MFG EV Power), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 8 Feb 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Saltwell Park (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Saltwell Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Saltwell Park (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Saltwell Park?
Saltwell Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Saltwell Park (Charge Your Car)?
MFG Lobley Hill (MFG EV Power) is 0.9 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Saltwell Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Saltwell Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Saltwell Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Crosskeys Lane
- UK Land Estates
- Gateshead College Autoskills Centre
- Gateshead Housing Keelman House
- Gateshead Leisure Centre 2
- Gateshead Library
- Fastest nearby
- Gateshead Leisure Centre 2 · 45 kW · 0.8 mi