Charge Your Car · EV charging site
East Street Car Park, Darlington
East Street, Darlington, DL1 1ND
East Street Car Park, Darlington is an EV charging site in Darlington, run by Charge Your Car. All 5 of its sockets are 7 kW Type 2, and the price is listed as £1.00/charge admin fee. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Russell Street Retail Park - Darlington (POGO), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee(from Open Charge Map, 20 Sept 2018)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at East Street Car Park, Darlington (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at East Street Car Park, Darlington (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does East Street Car Park, Darlington (Charge Your Car) have?
5 charging sockets: 5 × 7 kW Type 2.
Who operates East Street Car Park, Darlington?
East Street Car Park, Darlington is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to East Street Car Park, Darlington (Charge Your Car)?
Russell Street Retail Park - Darlington (POGO) is 0.1 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at East Street Car Park, Darlington (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at East Street Car Park, Darlington (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at East Street Car Park, Darlington (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Russell Street Retail Park - Darlington
- Commercial St West 1
- Darlington Town Hall
- Kendrew Street Car Park 4
- Abbots Yard Car Park, Darlington
- Park Place East 6
- Cheapest nearby
- Russell Street Retail Park - Darlington · 65p per kWh · 200 kW · 0.1 mi
- Fastest nearby
- Russell Street Retail Park - Darlington · 200 kW · 0.1 mi