Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Russell Street Retail Park - Darlington

Russel Street, Darlington, DL1 1TB

Russell Street Retail Park - Darlington is an EV charging site in Darlington, run by POGO. All 10 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 91% uptime and recorded 464 charging sessions here over the last 30 days. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bannatyne Health Club (InstaVolt Ltd), 0.1 miles away.

Status

8 of 10 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 200 kW10 connectors · 65p per kWh8 free2 in use
PoGo201117% reliabilityCharging
PoGo201117% reliabilityAvailable
PoGo20112100% reliabilityAvailable
PoGo20112100% reliabilityAvailable
PoGo20113100% reliabilityAvailable
PoGo20113100% reliabilityCharging
PoGo20114100% reliabilityAvailable
PoGo20114100% reliabilityAvailable
PoGo20115100% reliabilityAvailable
PoGo20115100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20111

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Russell Street Retail Park - Darlington (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Russell Street Retail Park - Darlington (POGO)?

Up to 200 kW DC via CCS.

How many charging sockets does Russell Street Retail Park - Darlington (POGO) have?

10 charging sockets: 10 × 200 kW CCS. Live per-socket availability is shown on this page.

When is Russell Street Retail Park - Darlington (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Russell Street Retail Park - Darlington (POGO)?

Amp Map measured 91% uptime here from recorded live status over the last 30 days, across 464 observed charging sessions.

Who operates Russell Street Retail Park - Darlington?

Russell Street Retail Park - Darlington is on the POGO network.

Where is the nearest other charger with 50 kW or more to Russell Street Retail Park - Darlington (POGO)?

Bannatyne Health Club (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Russell Street Retail Park - Darlington (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Russell Street Retail Park - Darlington (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Russell Street Retail Park - Darlington (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.