Charge Your Car · EV charging site
Grainger Town Car Park
Waterloo Street, Newcastle upon Tyne, NE1 4DP
Grainger Town Car Park is an EV charging site at Waterloo Street in Newcastle upon Tyne, run by Charge Your Car. All 11 of its sockets are 7 kW Type 2, and charging is listed as free. Amp Map lists 2 other charge points named Grainger Town Car Park in Newcastle upon Tyne. 39 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wellington Street (Fastned), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 21 Dec 2018)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Grainger Town Car Park (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Grainger Town Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Grainger Town Car Park (Charge Your Car) have?
11 charging sockets: 10 × 7 kW Type 2.
Who operates Grainger Town Car Park?
Grainger Town Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Grainger Town Car Park (Charge Your Car)?
Wellington Street (Fastned) is 0.4 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Grainger Town Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grainger Town Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grainger Town Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.