Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Wellington Street

Wellington Street, Newcastle upon Tyne, NE4 5BX

Wellington Street is an EV charging site in Newcastle upon Tyne, run by Fastned and open 24 hours a day. Its 6 sockets reach up to 175 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 890 charging sessions here over the last 30 days. 36 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Arnold Clark Dealership ( Not 24 Hours ) (Arnold Clark Dealer Network), 0.9 miles away.

Status

3 of 6 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 175 kW2 connectors · 79p per kWh1 free1 in use
4400105100% reliabilityAvailable
4400106100% reliabilityCharging
CCS or CHAdeMO or Type 2 · 50 kW4 connectors · 79p per kWh2 free2 in use
4400101100% reliabilityCharging
4400102100% reliabilityAvailable
440010396% reliabilityAvailable
4400104100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4400101
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS175 kW79p per kWh
CCS50 kW79p per kWh
CHAdeMO50 kW79p per kWh
Type 238 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 175 kW CCS~24 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 175 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 175 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 175 kW CCS~21 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 175 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 175 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Wellington Street (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Wellington Street (Fastned)?

Up to 175 kW DC via CCS, Type 2, CHAdeMO.

How many charging sockets does Wellington Street (Fastned) have?

6 charging sockets: 4 × 50 kW CCS, 4 × 38 kW Type 2, 4 × 50 kW CHAdeMO, 2 × 175 kW CCS. Live per-socket availability is shown on this page.

Is Wellington Street (Fastned) open 24/7?

Yes - Wellington Street (Fastned) is open 24 hours a day, 7 days a week.

When is Wellington Street (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Wellington Street (Fastned)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 890 observed charging sessions.

Who operates Wellington Street?

Wellington Street is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Wellington Street (Fastned)?

Arnold Clark Dealership ( Not 24 Hours ) (Arnold Clark Dealer Network) is 0.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wellington Street (Fastned)?

A typical 10–80% rapid charge takes about 24 min on the 175 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wellington Street (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 175 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wellington Street (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 175 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.