Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
Charging locations
44
Locations available now
43
From live status
Reliability · 30d
99%
measured over 192,401 socket-hours
Fastest charger
400 kW

About

Fastned has 44 charging locations with 287 sockets listed on Amp Map, across 1 country. Most of its sites with location data are on-street units. The network centres on ultra-rapid charging (250 kW+) - 80% of its rated locations. 287 sockets report live availability on Amp Map. The operator reports 44 locations as supplied by 100% renewable electricity.

Charging speeds

Fast · 22–100 kW6 locations · 14%
Rapid · 100–250 kW3 locations · 7%
Ultra-rapid · 250 kW+35 locations · 80%

How much does it cost to charge on Fastned?

Charging costs 79p/kWh across the network.

Fastned Gold Member (£4.99/month) takes 30% off the listed price.

Prices can change - always check the price on the charge point or in the operator's app before starting a charge.

Ways to pay

Operator's appFastned - EV charging app · App Store · Google Play
Start and pay in an app44 locations
Pay by card at the charger43 locations
RFID card or key fob44 locations

Locations whose data lists each way to pay. A location that lists nothing may still take it.

Fastned - app that can start a charge on this network.

Contact

Chargers by area