Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Barnard Castle

A688, Bishop Auckland, DL12 8TD

Barnard Castle is an EV charging site in Bishop Auckland, County Durham, run by Fastned and open 24 hours a day. Its 5 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 610 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Galgate Car Park (Be.EV), 0.7 miles away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW4 connectors · 79p per kWh4 free
4403603100% reliabilityAvailable
4403604100% reliabilityAvailable
4403605100% reliabilityAvailable
4403606100% reliabilityAvailable
CCS or CHAdeMO · 150 kW1 connector · 79p per kWh1 in use
4403601100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4403601
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Barnard Castle (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Barnard Castle (Fastned)?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Barnard Castle (Fastned) have?

5 charging sockets: 5 × 150 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Barnard Castle (Fastned) open 24/7?

Yes - Barnard Castle (Fastned) is open 24 hours a day, 7 days a week.

When is Barnard Castle (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Barnard Castle (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 610 observed charging sessions.

Who operates Barnard Castle?

Barnard Castle is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Barnard Castle (Fastned)?

Galgate Car Park (Be.EV) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Barnard Castle (Fastned)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barnard Castle (Fastned)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Barnard Castle (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.