Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Newcastle Airport

Short Stay 1, Darras Hall, NE20 9DB

Newcastle Airport is an EV charging site at Short Stay 1 in Darras Hall, Northumberland, run by Fastned and open 24 hours a day. Its 12 sockets reach up to 400 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 914 charging sessions here over the last 30 days. Amp Map lists 2 other charge points named Newcastle Airport in Darras Hall. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Newcastle Airport (Charge Your Car), 0.6 miles away.

Status

11 of 12 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 400 kW10 connectors · 79p per kWh9 free1 in use
4408002100% reliabilityAvailable
4408003100% reliabilityAvailable
4408004100% reliabilityAvailable
4408006100% reliabilityAvailable
4408007100% reliabilityAvailable
4408008100% reliabilityAvailable
4408009100% reliabilityCharging
4408010100% reliabilityAvailable
4408011100% reliabilityAvailable
4408012100% reliabilityAvailable
CCS or CHAdeMO · 400 kW2 connectors · 79p per kWh2 free
4408001100% reliabilityAvailable
4408005100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4408001
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Newcastle Airport (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Newcastle Airport (Fastned)?

Up to 400 kW DC via CCS, CHAdeMO.

How many charging sockets does Newcastle Airport (Fastned) have?

12 charging sockets: 12 × 400 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Newcastle Airport (Fastned) open 24/7?

Yes - Newcastle Airport (Fastned) is open 24 hours a day, 7 days a week.

When is Newcastle Airport (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Newcastle Airport (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 914 observed charging sessions.

Who operates Newcastle Airport?

Newcastle Airport is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Newcastle Airport (Fastned)?

Newcastle Airport (Charge Your Car) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Newcastle Airport (Fastned)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newcastle Airport (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Newcastle Airport (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.