Charge Your Car · EV charging site
Newcastle Airport
Newcastle Airport, Darras Hall, NE13 8BZ
Newcastle Airport is an EV charging site in Darras Hall, Northumberland (NE13 8BZ), run by Charge Your Car. All 3 of its sockets are 7 kW Type 2, and the price is listed as £1.00/charge admin fee. Amp Map lists 2 other charge points named Newcastle Airport in Darras Hall. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Newcastle Airport (Charge Your Car), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee(from Open Charge Map, 31 May 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Newcastle Airport (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at Newcastle Airport (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Newcastle Airport (Charge Your Car) have?
3 charging sockets: 3 × 7 kW Type 2.
Who operates Newcastle Airport?
Newcastle Airport is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Newcastle Airport (Charge Your Car)?
Newcastle Airport (Charge Your Car) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newcastle Airport (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newcastle Airport (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newcastle Airport (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Newcastle Airport
- Callerton Parkway Metro Station
- Newcastle Airport
- Pod Point Bellway Homes - Woolsington House
- Ponteland Leisure Centre
- Ponteland Leisure Centre
- Cheapest nearby
- Pod Point Bellway Homes - Woolsington House · 37.2p per kWh · 22 kW · 0.8 mi
- Fastest nearby
- Newcastle Airport · 400 kW · 0.7 mi