Charge Your Car · EV charging site
Newcastle Airport
Woolsington, Darras Hall, NE13 8BZ
Newcastle Airport is an EV charging site at Woolsington in Darras Hall, Northumberland, run by Charge Your Car. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. Amp Map lists 2 other charge points named Newcastle Airport in Darras Hall. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Newcastle Airport (Fastned), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Newcastle Airport (Charge Your Car)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Newcastle Airport (Charge Your Car) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Newcastle Airport?
Newcastle Airport is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Newcastle Airport (Charge Your Car)?
Newcastle Airport (Fastned) is 0.6 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newcastle Airport (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newcastle Airport (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newcastle Airport (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Newcastle Airport
- Newcastle Airport
- Callerton Parkway Metro Station
- Pod Point Bellway Homes - Woolsington House
- Ponteland Leisure Centre
- Ponteland Leisure Centre
- Cheapest nearby
- Pod Point Bellway Homes - Woolsington House · 37.2p per kWh · 22 kW · 0.7 mi
- Fastest nearby
- Newcastle Airport · 400 kW · 0.6 mi