Charge Your Car · EV charging site
Ponteland Leisure Centre
Callerton Lane, Darras Hall, NE20 9EG
Ponteland Leisure Centre is an EV charging site in Darras Hall, Northumberland (NE20 9EG), run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Ponteland Leisure Centre in Darras Hall. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Thornhill Road Car Park (Charge Your Car), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ponteland Leisure Centre (Charge Your Car)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Ponteland Leisure Centre (Charge Your Car) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Ponteland Leisure Centre?
Ponteland Leisure Centre is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Ponteland Leisure Centre (Charge Your Car)?
Thornhill Road Car Park (Charge Your Car) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ponteland Leisure Centre (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ponteland Leisure Centre (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ponteland Leisure Centre (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ponteland Leisure Centre
- Thornhill Road Car Park
- Newcastle Airport
- Newcastle Airport
- Newcastle Airport
- Callerton Parkway Metro Station
- Cheapest nearby
- Newcastle Airport · 79p per kWh · 400 kW · 2 mi
- Fastest nearby
- Newcastle Airport · 400 kW · 2 mi