Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Snargate Street (Dover)

Snargate Street, Dover, CT17 9AP

Snargate Street (Dover) is an EV charging site in Dover, Kent, run by Fastned and open 24 hours a day. Its 6 sockets reach up to 400 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 574 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MFG Dover Forecourt (MFG EV Power), 0.2 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 400 kW4 connectors · 79p per kWh4 free
4406502100% reliabilityAvailable
4406503100% reliabilityAvailable
4406504100% reliabilityAvailable
4406506100% reliabilityAvailable
CCS or CHAdeMO · 400 kW2 connectors · 79p per kWh2 free
4406501100% reliabilityAvailable
4406505100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4406501
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Snargate Street (Dover) (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Snargate Street (Dover) (Fastned)?

Up to 400 kW DC via CCS, CHAdeMO.

How many charging sockets does Snargate Street (Dover) (Fastned) have?

6 charging sockets: 6 × 400 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Snargate Street (Dover) (Fastned) open 24/7?

Yes - Snargate Street (Dover) (Fastned) is open 24 hours a day, 7 days a week.

When is Snargate Street (Dover) (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Snargate Street (Dover) (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 574 observed charging sessions.

Who operates Snargate Street (Dover)?

Snargate Street (Dover) is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Snargate Street (Dover) (Fastned)?

MFG Dover Forecourt (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Snargate Street (Dover) (Fastned)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Snargate Street (Dover) (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Snargate Street (Dover) (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.