Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Speculation Place

Spout lane, Washington, NE37 2AL

Speculation Place is an EV charging site in Washington, Sunderland, run by Fastned and open 24 hours a day. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 281 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Parsons Road (Fastned), 0.8 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or CHAdeMO or Type 2 · 50 kW3 connectors · 79p per kWh2 free1 in use
4400601100% reliabilityAvailable
4400602100% reliabilityAvailable
4400603100% reliabilityCharging
CCS or CHAdeMO · 50 kW1 connector · 79p per kWh1 free
4400604100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4400601
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW79p per kWh
CHAdeMO50 kW79p per kWh
Type 243 kW79p per kWh
Type 238 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Speculation Place (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Speculation Place (Fastned)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Speculation Place (Fastned) have?

4 charging sockets: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO, 2 × 38 kW Type 2, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.

Is Speculation Place (Fastned) open 24/7?

Yes - Speculation Place (Fastned) is open 24 hours a day, 7 days a week.

When is Speculation Place (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Speculation Place (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 281 observed charging sessions.

Who operates Speculation Place?

Speculation Place is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Speculation Place (Fastned)?

Parsons Road (Fastned) is 0.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Speculation Place (Fastned)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Speculation Place (Fastned)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Speculation Place (Fastned)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.