Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Columbus Way

Columbus Way, Andover, SP10 2PR

Columbus Way is an EV charging site in Andover, Hampshire, run by Fastned and open 24 hours a day. Its 4 sockets reach up to 100 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 1118 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is George Yard Medium Stay Car Park (Be.EV), 1 mile away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 100 kW2 connectors · 79p per kWh2 free
4402701100% reliabilityAvailable
4402703100% reliabilityAvailable
CCS or CHAdeMO · 100 kW2 connectors · 79p per kWh2 free
4402702100% reliabilityAvailable
4402704100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4402701
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS100 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Columbus Way (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Columbus Way (Fastned)?

Up to 100 kW DC via CHAdeMO, CCS.

How many charging sockets does Columbus Way (Fastned) have?

4 charging sockets: 2 × 50 kW CHAdeMO, 4 × 100 kW CCS. Live per-socket availability is shown on this page.

Is Columbus Way (Fastned) open 24/7?

Yes - Columbus Way (Fastned) is open 24 hours a day, 7 days a week.

When is Columbus Way (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Columbus Way (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1118 observed charging sessions.

Who operates Columbus Way?

Columbus Way is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Columbus Way (Fastned)?

George Yard Medium Stay Car Park (Be.EV) is 1 mile away in a straight line, with up to 60 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Columbus Way (Fastned)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Columbus Way (Fastned)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Columbus Way (Fastned)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.