Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Spitfire Way

Spitfire Way, Ramsgate, CT13 9FR

Spitfire Way is an EV charging site in Ramsgate, Kent, run by Fastned and open 24 hours a day. Its 6 sockets reach up to 300 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 100% uptime and recorded 497 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EG GROUP EG DISCOVERY, 120 yards away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW2 connectors · 79p per kWh2 free
4402101100% reliabilityAvailable
440210398% reliabilityAvailable
CCS or CHAdeMO · 300 kW2 connectors · 79p per kWh2 free
4402102100% reliabilityAvailable
4402104100% reliabilityAvailable
CCS · 150 kW2 connectors · 79p per kWh2 free
4402105100% reliabilityAvailable
4402106100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4402101
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW79p per kWh
CCS150 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Spitfire Way (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Spitfire Way (Fastned)?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does Spitfire Way (Fastned) have?

6 charging sockets: 2 × 150 kW CCS, 4 × 300 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Spitfire Way (Fastned) open 24/7?

Yes - Spitfire Way (Fastned) is open 24 hours a day, 7 days a week.

When is Spitfire Way (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Spitfire Way (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 497 observed charging sessions.

Who operates Spitfire Way?

Spitfire Way is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Spitfire Way (Fastned)?

EG GROUP EG DISCOVERY is 120 yards away in a straight line, with up to 175 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Spitfire Way (Fastned)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spitfire Way (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Spitfire Way (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.