Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Durham Road

N Moor Rd, Sunderland, SR3 1TJ

Durham Road is an EV charging site in Sunderland, run by Fastned and open 24 hours a day. Its 6 sockets reach up to 300 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 1016 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lidl-Sunderland, 0.5 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW3 connectors · 79p per kWh2 free1 in use
4403301100% reliabilityAvailable
4403303100% reliabilityCharging
4403305100% reliabilityAvailable
CCS or CHAdeMO · 300 kW3 connectors · 79p per kWh2 free1 in use
4403302100% reliabilityAvailable
4403304100% reliabilityAvailable
4403306100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4403301
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Durham Road (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Durham Road (Fastned)?

Up to 300 kW DC via CHAdeMO, CCS.

How many charging sockets does Durham Road (Fastned) have?

6 charging sockets: 3 × 50 kW CHAdeMO, 6 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Durham Road (Fastned) open 24/7?

Yes - Durham Road (Fastned) is open 24 hours a day, 7 days a week.

When is Durham Road (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Durham Road (Fastned)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1016 observed charging sessions.

Who operates Durham Road?

Durham Road is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Durham Road (Fastned)?

Lidl-Sunderland is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Durham Road (Fastned)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Durham Road (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Durham Road (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.