Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fastned · EV charging site

Palace Grounds

Palace Grounds Road, Hamilton, ML3 6AD

Palace Grounds is an EV charging site in Hamilton, South Lanarkshire, run by Fastned and open 24 hours a day. Its 8 sockets reach up to 300 kW, with CCS at the top speed, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 99% uptime and recorded 2485 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Keith Street Car Park (Chargeplace Scotland), 0.1 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Fastned’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 300 kW5 connectors · 79p per kWh5 free
440100199% reliabilityAvailable
4401003100% reliabilityAvailable
4401005100% reliabilityAvailable
4401006100% reliabilityAvailable
440100797% reliabilityAvailable
CCS or CHAdeMO · 300 kW3 connectors · 79p per kWh3 free
4401002100% reliabilityAvailable
4401004100% reliabilityAvailable
440100898% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Fastned
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Fastned appRFID card
Charger ID
4401001
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW79p per kWh
CHAdeMO50 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Palace Grounds (Fastned)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Palace Grounds (Fastned)?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does Palace Grounds (Fastned) have?

8 charging sockets: 8 × 300 kW CCS, 3 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Palace Grounds (Fastned) open 24/7?

Yes - Palace Grounds (Fastned) is open 24 hours a day, 7 days a week.

When is Palace Grounds (Fastned) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Palace Grounds (Fastned)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 2485 observed charging sessions.

Who operates Palace Grounds?

Palace Grounds is on the Fastned network.

Where is the nearest other charger with 50 kW or more to Palace Grounds (Fastned)?

Keith Street Car Park (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Palace Grounds (Fastned)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Palace Grounds (Fastned)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Palace Grounds (Fastned)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.