Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Charge Your Car · EV charging site

Grey Street Junction With Mosely Street

Grey Street, Newcastle upon Tyne, NE1 6AE

Grey Street Junction With Mosely Street is an EV charging site in Newcastle upon Tyne (NE1 6AE), run by Charge Your Car. Its 3 sockets reach up to 4 kW, with Type 2 at the top speed, and charging is listed as free. Amp Map lists 1 other charge point named Grey Street Junction With Mosely Street in Newcastle upon Tyne. 42 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 3 Jun 2020Last verified 3 Jun 2020

Connectors

Type 2 · 4 kW2 connectors
BS1363 3 Pin 13 Amp · 3 kW1 connector

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
Free(from Open Charge Map, 3 Jun 2020)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Grey Street Junction With Mosely Street (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Grey Street Junction With Mosely Street (Charge Your Car)?

Up to 4 kW AC via Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does Grey Street Junction With Mosely Street (Charge Your Car) have?

3 charging sockets: 2 × 4 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

Who operates Grey Street Junction With Mosely Street?

Grey Street Junction With Mosely Street is on the Charge Your Car network.

Where is the nearest charger with 50 kW or more to Grey Street Junction With Mosely Street (Charge Your Car)?

Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Grey Street Junction With Mosely Street (Charge Your Car)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grey Street Junction With Mosely Street (Charge Your Car)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Grey Street Junction With Mosely Street (Charge Your Car)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 3 Jun 2020

Amp Map does not take payment. You pay the operator.