Charge Your Car · EV charging site
Jarrow Station Car Park 2
Station Street, Jarrow, NE32 3JS
Jarrow Station Car Park 2 is an EV charging site in Jarrow, South Tyneside, run by Charge Your Car. It has a single 7 kW Type 2 socket. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is South Tyneside Homes Viking Industrial Estate (Charge Your Car), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Napier Street
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Jarrow Station Car Park 2 (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Jarrow Station Car Park 2 (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Jarrow Station Car Park 2?
Jarrow Station Car Park 2 is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Jarrow Station Car Park 2 (Charge Your Car)?
South Tyneside Homes Viking Industrial Estate (Charge Your Car) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Jarrow Station Car Park 2 (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jarrow Station Car Park 2 (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Jarrow Station Car Park 2 (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.