Charge Your Car · EV charging site
Tedco Business Centre, Ne32 3DT
Tedco Business Centre, Jarrow, NE32 3DT
Tedco Business Centre, Ne32 3DT is an EV charging site in Jarrow, South Tyneside, run by Charge Your Car. Both of its sockets are 22 kW Type 2, and charging is listed as free. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is South Tyneside Homes Viking Industrial Estate (Charge Your Car), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 12 Sept 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Tedco Business Centre, Ne32 3DT (Charge Your Car)?
Up to 22 kW AC via Type 2.
How many charging sockets does Tedco Business Centre, Ne32 3DT (Charge Your Car) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Tedco Business Centre, Ne32 3DT?
Tedco Business Centre, Ne32 3DT is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Tedco Business Centre, Ne32 3DT (Charge Your Car)?
South Tyneside Homes Viking Industrial Estate (Charge Your Car) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- South Tyneside Homes Viking Industrial Estate
- The Eco Centre
- South Tyneside Homes Viking Industrial Estate
- Jarrow Station Car Park 2
- Tyne Street Car Park
- Morrisons Jarrow
- Fastest nearby
- South Tyneside Homes Viking Industrial Estate · 50 kW · 0.1 mi