Charge Your Car · EV charging site
North Shore Academy
Talbot Street, Stockton-on-Tees, TS20 2AY
North Shore Academy is an EV charging site in Stockton-on-Tees, run by Charge Your Car. All 8 of its sockets are 7 kW Type 2, and charging is listed as free. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Collectables Retail Park (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 17 Jul 2018)
- Getting there
- for employee and visitor use only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at North Shore Academy (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at North Shore Academy (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does North Shore Academy (Charge Your Car) have?
8 charging sockets: 3 × 7 kW Type 2.
Who operates North Shore Academy?
North Shore Academy is on the Charge Your Car network.
Can anyone charge at North Shore Academy (Charge Your Car)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to North Shore Academy (Charge Your Car)?
Collectables Retail Park (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Shore Academy (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Shore Academy (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Shore Academy (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Thompson Street Car Park
- Simon Bailes Peugeot Stockton
- Collectables Retail Park
- Stockton Municipal Buildings
- Stockton Municipal Buildings
- Bishop Street Car Park
- Fastest nearby
- Collectables Retail Park · 50 kW · 0.6 mi