InstaVolt Ltd · EV charging site
Collectables Retail Park
Ross Road, Stockton-on-Tees, TS18 2LX
Collectables Retail Park is an EV charging site in Stockton-on-Tees, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bishop Street Car Park (Charge Your Car), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Collectables Retail Park (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Collectables Retail Park (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Collectables Retail Park (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.
Who operates Collectables Retail Park?
Collectables Retail Park is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Collectables Retail Park (InstaVolt Ltd)?
Bishop Street Car Park (Charge Your Car) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Collectables Retail Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Collectables Retail Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Collectables Retail Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Simon Bailes Peugeot Stockton
- Durham University Queens Campus
- North Shore Academy
- Durham University Ebsworth Building
- Pod Point RazorBlue - Admiralty House
- Stockton Riverside College
- Cheapest nearby
- Pod Point RazorBlue - Admiralty House · 24p per kWh · 7 kW · 0.7 mi