Charge Your Car · EV charging site
Nunnery Lane car park
43 Nunnery Lane, York, YO23 1AA
Nunnery Lane car park is an EV charging site at 43 Nunnery Lane in York, City of York, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Nunnery Lane car park in York. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Nunnery Lane Car Park - City of York Council (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Getting there
- 24hr access
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Nunnery Lane car park (Charge Your Car)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Nunnery Lane car park (Charge Your Car) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Nunnery Lane car park?
Nunnery Lane car park is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Nunnery Lane car park (Charge Your Car)?
Nunnery Lane Car Park - City of York Council (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nunnery Lane car park (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nunnery Lane car park (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nunnery Lane car park (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nunnery Lane Car Park
- Nunnery Lane Car Park - City of York Council
- Castle Car Park
- Pod Point Lendal Tower
- DRAX00217
- Novotel Hotel York Centre
- Cheapest nearby
- Pod Point Lendal Tower · 55.2p per kWh · 7 kW · 0.4 mi