Charge Your Car · EV charging site
Nunnery Lane Car Park
Nunnery Lane, York, YO23 1AA
Nunnery Lane Car Park is an EV charging site in York, City of York (YO23 1AA), run by Charge Your Car. All 6 of its sockets are 7 kW Type 2, and the price is listed as £0.15/kWh. Amp Map lists 1 other charge point named Nunnery Lane Car Park in York. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Nunnery Lane Car Park - City of York Council (BP Pulse), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.15/kWh(from Open Charge Map, 11 Mar 2020)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nunnery Lane Car Park (Charge Your Car)?
The listed price is £0.15/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Nunnery Lane Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Nunnery Lane Car Park (Charge Your Car) have?
6 charging sockets: 2 × 7 kW Type 2.
Who operates Nunnery Lane Car Park?
Nunnery Lane Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Nunnery Lane Car Park (Charge Your Car)?
Nunnery Lane Car Park - City of York Council (BP Pulse) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nunnery Lane Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nunnery Lane Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nunnery Lane Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nunnery Lane Car Park - City of York Council
- Nunnery Lane car park
- Pod Point Lendal Tower
- New Holgate Hotel
- Marygate Car Park - City of York Council
- Castle Car Park
- Cheapest nearby
- Pod Point Lendal Tower · 55.2p per kWh · 7 kW · 0.4 mi
- Fastest nearby
- Nunnery Lane Car Park - City of York Council · 50 kW · 10 yd