Charge Your Car · EV charging site
Stockton On Tees
North Shore Academy, Stockton-on-Tees, TS19 9LT
Stockton On Tees is an EV charging site in Stockton-on-Tees, run by Charge Your Car. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Stockton-on-tees, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.65/kWh(from Open Charge Map, 27 Nov 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Stockton On Tees (Charge Your Car)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Stockton On Tees (Charge Your Car)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Stockton On Tees (Charge Your Car) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Stockton On Tees?
Stockton On Tees is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Stockton On Tees (Charge Your Car)?
Pod Point Tesco Extra - Stockton-on-tees is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stockton On Tees (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stockton On Tees (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stockton On Tees (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Stockton-on-tees
- Tithebarn House
- Billingham Golf Club
- North Shore Academy
- Wynyard Woodlands Park
- Thompson Street Car Park
- Cheapest nearby
- Pod Point Tesco Extra - Stockton-on-tees · 44.4p per kWh · 50 kW · 0.4 mi