Charge Your Car · EV charging site
The Lanes Car Park
Black Lion Street, Brighton, BN1 1ND
The Lanes Car Park is an EV charging site in Brighton, Brighton and Hove, run by Charge Your Car. All 4 of its sockets are 7 kW Type 2. 81 other charging sites are listed within a mile, and the nearest site with 50 kW or more is University Way SF Connect (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee. Parking fees apply(from Open Charge Map, 16 Apr 2019)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Lanes Car Park (Charge Your Car)?
The listed price is £1.00/charge admin fee. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at The Lanes Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Lanes Car Park (Charge Your Car) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates The Lanes Car Park?
The Lanes Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to The Lanes Car Park (Charge Your Car)?
University Way SF Connect (BP Pulse) is 1.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Lanes Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Lanes Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Lanes Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 38-08127 - Kings Road
- Bartholomews
- Madeira Drive, Brighton
- 05860 Broad Street
- NCP Brighton Centre Russell Road
- 5800 Russell Square
- Fastest nearby
- NCP Brighton Centre Russell Road · 22 kW · 0.3 mi