Charge Your Car · EV charging site
Town Hall Multi-Storey Car Park
The Boulevard, Crawley, RH10 1UZ
Town Hall Multi-Storey Car Park is an EV charging site in Crawley, West Sussex, run by Charge Your Car. All 4 of its sockets are 22 kW Type 2, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Orchard Street Surface Car Park (Charge Your Car), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 10 Nov 2018)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Town Hall Multi-Storey Car Park (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Town Hall Multi-Storey Car Park (Charge Your Car)?
Up to 22 kW AC via Type 2.
How many charging sockets does Town Hall Multi-Storey Car Park (Charge Your Car) have?
4 charging sockets: 4 × 22 kW Type 2.
Who operates Town Hall Multi-Storey Car Park?
Town Hall Multi-Storey Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Town Hall Multi-Storey Car Park (Charge Your Car)?
Orchard Street Surface Car Park (Charge Your Car) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Town Hall Multi-Storey Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Town Hall Multi-Storey Car Park (Charge Your Car)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Town Hall Multi-Storey Car Park (Charge Your Car)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- County Mall County Mall 3
- Orchard Street Surface Car Park
- BMW Vines of Gatwick
- Schneider Electric Visitor Car Park
- RAW Greene King Snooty Fox 1
- Pod Point Tesco Extra - Crawley (Rapid Charger)
- Cheapest nearby
- Pod Point Tesco Extra - Crawley (Rapid Charger) · 44.4p per kWh · 50 kW · 1 mi
- Fastest nearby
- Orchard Street Surface Car Park · 50 kW · 0.4 mi