EV charging site
Schneider Electric Visitor Car Park
Manor Royal, Crawley, RH10 9SJ
Schneider Electric Visitor Car Park is an EV charging site in Crawley, West Sussex. Both of its sockets are 7 kW Type 2, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Basepoint Crawley (Be.EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 3 Nov 2015)
- Phone (from Open Charge Map)
- 01293 526000
- Getting there
- For employees and invited guests only, ask reception for RFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Schneider Electric Visitor Car Park?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Schneider Electric Visitor Car Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Schneider Electric Visitor Car Park have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Can anyone charge at Schneider Electric Visitor Car Park?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Schneider Electric Visitor Car Park?
Basepoint Crawley (Be.EV) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Schneider Electric Visitor Car Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Schneider Electric Visitor Car Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Schneider Electric Visitor Car Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Basepoint Crawley
- Pod Point Ibis Styles, London Gatwick Airport
- Gatwick, UK - County Oak
- Avensys
- Pod Point Motorline Gatwick - Hyundai
- Town Hall Multi-Storey Car Park
- Cheapest nearby
- Pod Point Ibis Styles, London Gatwick Airport · 25.2p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Gatwick, UK - County Oak · 250 kW · 0.6 mi